
20 kVA diesel generator — models, fuel consumption and price.
A 20 kVA standby generator delivers about 16 kW at 0.8 power factor (roughly 18.2 kVA prime). At 75 % load it burns around 2.5 litres of diesel per hour. BRO Global supplies brand-new 20 kVA sets in Saudi Arabia at 60 Hz — open, silent canopy or containerized — with OEM datasheets, manufacturer warranty and a priced offer within 24 hours.
16 kW
Output at 0.8 PF
18.2 kVA
Prime rating (≈)
2.5 L/h
Fuel at 75 % load (≈)
0 L
8-hour base tank (≈)
What a 20 kVA generator typically powers
- ✓A villa or small residence with AC
- ✓A clinic, pharmacy or small shop
- ✓A telecom tower or remote cabin
- ✓Site offices and lighting on a small construction site
Selection chart
Models around 20 kVA we supply
Ratings within about 15 % of 20 kVA at 60 Hz (Saudi grid) and 50 Hz (GCC). Prime shown as standby ÷ 1.1; final figures in the datasheet with your offer.
| BRO model | Brand | Hz | Standby | Prime | Engine |
|---|---|---|---|---|---|
| PK22-50 | Perkins | 50 | 22 kVA | 20 kVA | 404A-22G1 |
| BD22-50 | Baudouin | 50 | 22 kVA | 20 kVA | 4M06G20/5 |
| KU22-50 | Kubota | 50 | 22 kVA | 20 kVA | V2203-E2-BG |
| PK17-50 | Perkins | 50 | 17 kVA | 15.5 kVA | 403A-15G2 |
| PK20-60 | Perkins | 60 | 20 kVA | 18.2 kVA | 403A-15G2 |
| KU20-60 | Kubota | 60 | 20 kVA | 18.2 kVA | D1703-E2-BG |
| PK17_5-60 | Perkins | 60 | 17.5 kVA | 15.9 kVA | 403A-15G1 |
Ratings are typical standby kVA at 0.8 PF (1500 rpm at 50 Hz, 1800 rpm at 60 Hz); prime is shown as standby ÷ 1.1. Exact prime/standby ratings, fuel consumption, dimensions and weight are confirmed in the OEM datasheet issued with your offer. Alternator (Leroy Somer / Stamford) and enclosure are selected on the quote form.
Generator FAQ
20 kVA — Generator FAQ
How many kW is a 20 kVA generator?
How much fuel does a 20 kVA generator use?
Should I buy 20 kVA standby or prime?
What is the price of a 20 kVA generator in Saudi Arabia?
Request a quote
Tell us the load. We'll send a priced offer within 24 hours.
The more you share, the sharper the offer — but a kVA and a city are enough to start.
Need a generator on site this month?
Call or WhatsApp our team — we answer with availability and a price the same day.
